What you need to know about oil and gas simulators
As the economy develops, the demand for resources increases. In order to better provide power support for economic development, the exploitation of oil, natural gas and other resources has been increased, and higher requirements have also been placed on drilling technology, especially in deep well drilling, because the environment it faces is more difficult. Harsh, so the support of related well control technology is more needed.
Due to the difficulty of deep well drilling and the high technical requirements, it is necessary to continuously increase technological innovation in work practice, so as to ensure the good progress of deep well drilling and well control and provide impetus for the development of the petroleum industry.
In the process of drilling shallower layers, due to environmental and technical constraints, many problems and challenges will still be encountered, especially in deep well drilling. Therefore, in order to better carry out safe production, in the future work, we must actively carry out continuous innovation and practice, on the basis of ensuring the normal operation of equipment, innovate technology development, reduce the safety hazards of deep well drilling and well control engineering, and better Dedicated to safe production.
The drilling well control technology still faces many difficulties. In order to better complete the drilling well control operation, the following points should be paid attention to:
(1) Before drilling, the formation fracture pressure and formation pore pressure must be accurately predicted, and the drilling fluid density and wellbore structure must be determined. Accurately analyze and evaluate the possibility of shallow gas, and try to avoid shallow gas locations when selecting well control well locations to reduce shallow gas damage.
(2) During the construction process, tools such as pressure measurement while drilling and logging while drilling are used to detect changes in annular pressure and formation in real time, so as to achieve early detection and early control of overflow.
(3) According to the stratigraphic conditions of the construction site, the drilling fluid should be reasonably selected, and the drilling process should be adopted reasonably to avoid the generation of hydrate to the greatest extent.
In order to improve the quality of employees in the petroleum industry, it is necessary to start with the training of trainees. After decades of research and development, Esimtech has created a drilling well control simulator for online training. Esimtech has passed the IADC and IWCF certification, and is a professional high-tech enterprise integrating RD, manufacturing and sales. In all fields of the petroleum industry, if you need related online simulator training, you can contact us.